SAFETY SECURITY INFRASTRUCTURE

We are currently accepting BIDS for our upcoming Capital Project.

Interested parties can attend a Pre-BID walkthrough on Tuesday, February 1st at 3:30pm in the HS Auditorium. 

Questions can be directed to C&S at 607-272-8589.

2021 Capital Improvement Project - Package A

2021 Capital Improvement Project - Package B  

 

Capital Project 

Vote Results: 163-yes, 116-no

Thank you for your support. 

In the 2019-2020 school year and into the summer and fall of 2020-2021 school year, the Spencer-Van Etten Central School District completed a State-mandated Building Condition Survey (BCS). This survey is conducted every five years and is needed to identify facility needs and improvements. SVE district hired an architect firm to complete this process in partnership with the district. Building off of this assessment and our previous Capital Projects, the District has been exploring and considering this project as part of its long-range strategic plan and Board of Education goals relating to fiscal stability and financial planning. This capital project falls into three main focal points: safety, security, infrastructure. 

Project Goals

Safety. Security. Infrastructure. 

 

Project Updates

Project planning and design continuing, field verification of specific items is taking place. 

 

Timeline

Currently in schematic design and design development submission phase to keep on track for the Fall 2021 NYSED Review.

  • Fall 2021 - NYSED Review

  • Spring 2022 - Construction Start

  • Fall 2023 - Construction End

  • Fall/Winter 2023 - Certificates of Substantial Completion Issued

     

 

Project Highlights

Check back when project begins. 

 

Project Videos

Take a Capital Project Virtual Tour (click here!)

Capital Project FAQ Video (click here!)

Elementary School Secure Vestibule Video (click here!)

High School Secure Vestibule Video (click here!) 

 

Project Scope

Safety 

High School

  • Replace wood siding with non-combustible material, non-ADA door handles, wire glass, fire alarm system including CO detection and add emergency lighting 

  • Upgrade PA/Master Clock system, electrical

  • Add fire rated glass, window shading 

Middle School

  • Replace PA and master clock system, wireglass, generator, transfer switch, emergency panels

  • Reattach handrails

  • Install emergency exterior lighting

Elementary School

  • Replace non fire-rated corridor doors, wire glass, generator, transfer switch, emergency panels, fire alarm system including CO detection and add emergency lighting

  • Upgrade PA/Master Clock system, electrical

  • Install emergency exterior lighting

Transportation Facility 

  • Upgrade electrical, IT systems

  • Install emergency exterior lighting, generator, transfer switch, emergency panel 

  • Reattach loose fire proofing

     

Security

High School

  • Secure vestibule

Middle School

  • NOTE: Secure vestibule installation is part of the Smart Schools project being completed Summer of 2021, a separate project from the proposed Capital Project.

Elementary School

  • Secure vestibule: includes main office, nurse's office, girl's toilet room spaces

     

Infrastructure

High School

  • Replace drainage structures, asphalt, softball infield, boilers, unit ventilators, rooftop units, control wiring, hot water piping, plumbing

  • Re-brick, anchor brick panel, brick repointing

Middle School

  • Replace sidewalks, door frames, column bases, window shades, boilers, retro-commissioning, controls wiring, classroom unit ventilator

  • Reattach loose ladders, rusted doors, brick repointing

  • Repair locker room cracks, drywall ceiling, fire pump seals

  • Install isolation valves

  • Address water issue in basement and water infiltration at stair addition

Elementary School

  • Replace pavement, damaged concrete wall, deteriorated concrete, corroded steel lintels, float glass, sink faucets, water coolers, unit ventilators, controls wiring

  • Modify site electrical

  • Install switchboard, distribution panel, additional isolation valves, auditorium relief air

  • Address corroded framing, close off under stage

  • Identify ADA cubby locations

  • Masonry repointing

  • Retro-commissioning

Transportation Facility 

  • Replace pavement, overhead door and opener, windows, bus lifts, oil/water separator, water heater and circulation pump, boiler

  • Upgrade vehicle exhaust

  • Install heat to dispensers

  • Address water damage to exterior, rusted lintels, roof leak